Driveways & flatwork
Broken out, poured again, built for the truck
- From
- $9 a sq ft
- How long
- Two to three days, then a week before you drive on it
Most of our work is flatwork: driveways, walks, the slab behind the garage. Each one starts with the ground, because a slab is only as good as what it sits on. We dig to depth, slope it to drain, and lay and compact four to six inches of crushed limestone before a form goes in.
Then the steel: rebar tied in a grid and lifted on chairs, so it ends up in the middle of the slab where it does its job. We pour early in the morning, screed it level, float and broom it, and cut the control joints the same afternoon. You get a written price before we dig, and we seal it for you after twenty-eight days.

What's included
- Old concrete broken out and hauled
- Grading and a compacted limestone base
- Rebar on chairs, 4,000 PSI mix
- Broom finish and saw-cut control joints
- Sealed after 28 days
Typical jobs
- A two-car driveway poured again
- A walk from the drive to the door
- An RV pad beside the garage
- A slab for a shed or a hot tub